Home
General Overview
Online Documents
Flight
Performance
 
Access to Data
 
Daily Observation History
Photo Gallery
Related Sites
Personnel
Intranet
Rules of the Road
Contact Us
The Final Word
PIF Calibration Summaries

Memo Title

Day

HRE #1 coating data

May 23, 1986

MRE #1 coating data

May 28, 1986

LRE #1 coating data

May 28, 1986


Utilization of SC-1 for EPET test A analysis w.r.t. USTOL (dobbs)

January 01, 1987

Request for quotes for second filter order

January 06, 1987

IPD 44 Dark Count Data

January 21, 1987

Effective Indices for HRDI Flight Filters

February 23, 1987

HRDI #1 Gap Thickness

February 23, 1987

Etendue Comparison Between Etalons and Telesco

February 23, 1987

Adjustment to MRE #1

March 04, 1987

MRE #1 Gap Thickness

March 05, 1987

Etalon surface mapping I. Theory and technique

May 12, 1987

Etalon surface mapping: Effect of post length change on surface

May 12, 1987

Coating Data for HRE #2

June 08, 1987

Coating Data for MRE #2

June 08, 1987

Coating Data for LRE #2

June 08, 1987

Effect of coating on distortion

June 09, 1987

HRE thermal drift from dye laser measurements

June 09, 1987

HRE #1 Thermal Drift

June 10, 1987

Effects of spring force

June 23, 1987

HRDI Flight Filters-Initial examination

July 23, 1987

LRE #1 Stability

July 27, 1987

HRE #1 characterization

October 07, 1987

Etalon performance as a function of orientation

November 12, 1987

Calibration of NBS Lamp #2

November 18, 1987

PIF Throughput I. Optics and HRE Transmittance at 6300 Å

November 25, 1987

Detector Mean Count Rate II. Modification to October 15, 1987

December 02, 1987

LRE #1 Reflectivity estimates

December 02, 1987

LRE #1 and MRE #1 Thermal and Voltage Analysis

December 16, 1987

MRE #1 Reflectivity

December 16, 1987

PIF and HRE Thermal Drift Preliminary Examination

December 17, 1987


MRF #1 gradient offset

January 28, 1988

Thermal drift of filter order #1

February 02, 1988

Addendum to memo "LRE #1 and MRE #1 Thermal and Voltage Analysis"

February 02, 1988

MRE #1 Thermal Performance, I. Equilibrium Drift

February 02, 1988

Statement of work for second filter order

February 16, 1988

White Light Estimate of HRE #2 Reflectivity

February 17, 1988

New Anode Gain Theory

March 10, 1988

High Pass Filter for HRDI

September 23, 1988

Convolver Routine

November 10, 1988

HRDI PF Filter Wheels

December 07, 1988

MRE #2 Plates

December 09, 1988

Manufacture Date filter set #2

December 09, 1988

Photometer Gain Change

December 19, 1988

Model for IPD and HPC dark count. Version I

December 20, 1988

Convolver Routine Update

December 21, 1988

Alternative to Photometer pulse counting

December 21, 1988

HRE #1 Flatness Maps from Perkin-Elmer

December 30, 1988

MRE #1 Flatness Maps from Perkin-Elmer

December 30, 1988

LRE #1 Flatness Maps from Perkin-Elmer

December 30, 1988

HRE #2 Flatness Maps from Perkin-Elmer

December 30, 1988

Broadening Valves for IPD-46

December 30, 1988

MRE #2 Flatness Maps from Perkin- Elmer

December 30, 1988

LRE #2 Flatness Maps from Perkin- Elmer

December 30, 1988


Relative HPC response

January 04, 1989

Telescope transmittance Data

January 11, 1989

Light Distribution of HRE Plane

January 18, 1989

Light Distribution at Image plane

January 18, 1989

MRE #1 Maps

January 18, 1989

LRE #1 maps

January 18, 1989

HRE #1 maps

January 18, 1989

Dye laser scan of 1-10-89

January 19, 1989

IPD-48 Quantum efficiency

January 23, 1989

Questar Focal Length

February 13, 1989

Gain changes for the HPC

February 23, 1989

Dye scans of March 6, 1989

March 07, 1989

Operation of PIF with PSE Simulator

April 03, 1989

IPD-49 quantum efficiency

April 03, 1989

Effects of perfect anodes on effective peak of interferometer

April 04, 1989

Effects of MRE finesse wind measurements

April 04, 1989

Vibration interferometer data

April 10, 1989

IPD-49 blur spot sizes

April 10, 1989

IPD dark count -low temperature Problem

May 05, 1989

HRDI flight filters calibration (continue Summary X)

May 05, 1989

Current etalon finesses

May 05, 1989

Approximate anode locations for default O2 Science lines

May 10, 1989

LRE and MRE voltage and thermal terms

May 10, 1989

HRDI reference line position

May 10, 1989

HRDI default modes of operation

May 11, 1989

HPC response as Function of orientation

May 11, 1989

Dye Laser scans of 1-10-89 revised finesse calculations

May 11, 1989

Dye laser scans of 1-3-89 revised finesse calculations

May 11, 1989

Dye laser scans of 1-6-89 revised finesse calculations

May 11, 1989

HRDI long term calibration

May 15, 1989

Ball memo-initial test results on 2 LTC and 12 fiber rods

May 31, 1989

HRE thermal Drift

June 02, 1989

Revised etalon voltage coefficient

June 05, 1989

Calculated P/T free spectral range

June 12, 1989

Etalon gradient offsets

June 20, 1989

Dye laser scans of February 16, 1989 finesse calculations

June 27, 1989

Dye laser scans of March 5, 1989 finesse calculations

June 27, 1989

Dye laser scans of March 9, 1989 finesse calculations

June 27, 1989

Dye laser scans of March 20, 1989 finesse calculations

June 27, 1989

Dye laser scans of March 23, 1989 finesse calculations

June 27, 1989

Dye laser scans of April 5, 1989 finesse calculations

June 27, 1989

Dye laser scans of April 12, 1989 finesse calculations

June 27, 1989

Dye laser scans of April 14, 1989 finesse calculations

June 27, 1989

Dye Laser scans of April 17, 1989 finesse calculations

June 27, 1989

Dye laser scans of April 18. 1989 finesse calculations

June 27, 1989

Dye laser scans of May 3, 1989 finesse calculations

June 27, 1989

Dye laser scans of May 8, 1989 finesse calculations

June 27, 1989

Dye laser scans of May 17, 1989 finesse calculations

June 27, 1989

Dye laser scans of May 31, 1989 finesse Calculations

June 27, 1989

Dye laser scans of April 7, 1989 finesse calculations

June 28, 1989

HRDI reference position

June 29, 1989

IPD-49 and HPC dark counts

June 30, 1989

HRDI/PIF stability

July 06, 1989

Dye laser scans of July 7, 1989

July 10, 1989

Dye laser scans of July 7, 1989

July 10, 1989

HRDI/PIF IPD-49 dead time

July 12, 1989

HRDI Mechanism speeds

July 19, 1989

Dead time correction

July 20, 1989

HPC dead time

July 24, 1989

HRDI calibration flight filters (Continued Summary IX)

 

HPC sensitivity

July 24, 1989

Line positions: Instrument warm in vacuum

August 14, 1989

Normalization constants variation with IPD high voltage and discriminator

August 16, 1989

Additional Calibration lines

August 16, 1989

Repeatability test specification

August 28, 1989

IPD sensitivity variation

August 31, 1989

HRDI internal white light lamp

September 05, 1989

Light Distribution at LRF plane II. July 17, 1989

September 07, 1989

Light Distribution of image plane II. July 17, 1989

September 07, 1989

Temporary wavenumber assignment for plotting white light scans

September 08, 1989

Dye laser scans of Sept. 14, 1989, finesse calculation

September 14, 1989

Repeatability test #1 result

September 14, 1989

O2 lamp Spectra

September 15, 1989

Data location of data taken September 20, 1989

September 20, 1989

MRE and LRE finesse

September 20, 1989

Data location of data taken September 19, 1989

September 21, 1989

White light scans from September 20, 1989

September 21, 1989

Conversion of counts to R/cm¯¹

September 29, 1989

Activities of September 30, 1989