PIF Calibration Summaries |
| |
|
| |
|
|
| Utilization
of SC-1 for EPET test A analysis w.r.t. USTOL (dobbs) |
January
01, 1987 |
|
Request
for quotes for second filter order |
January
06, 1987 |
|
IPD
44 Dark Count Data |
January
21, 1987 |
|
Effective
Indices for HRDI Flight Filters |
February
23, 1987 |
|
HRDI
#1 Gap Thickness |
February
23, 1987 |
|
Etendue
Comparison Between Etalons and Telesco |
February
23, 1987 |
|
Adjustment
to MRE #1 |
March
04, 1987 |
|
MRE
#1 Gap Thickness |
March
05, 1987 |
|
Etalon
surface mapping I. Theory and technique |
May
12, 1987 |
|
Etalon
surface mapping: Effect of post length change on surface |
May
12, 1987 |
|
Coating
Data for HRE #2 |
June
08, 1987 |
|
Coating
Data for MRE #2 |
June
08, 1987 |
|
Coating
Data for LRE #2 |
June
08, 1987 |
|
Effect
of coating on distortion |
June
09, 1987 |
|
HRE
thermal drift from dye laser measurements |
June
09, 1987 |
|
HRE
#1 Thermal Drift |
June
10, 1987 |
|
Effects
of spring force |
June
23, 1987 |
|
HRDI
Flight Filters-Initial examination |
July
23, 1987 |
|
LRE
#1 Stability |
July
27, 1987 |
|
HRE
#1 characterization |
October
07, 1987 |
|
Etalon
performance as a function of orientation |
November
12, 1987 |
|
Calibration
of NBS Lamp #2 |
November
18, 1987 |
|
PIF
Throughput I. Optics and HRE Transmittance at 6300 Å |
November
25, 1987 |
|
Detector
Mean Count Rate II. Modification to October 15, 1987 |
December
02, 1987 |
|
LRE
#1 Reflectivity estimates |
December
02, 1987 |
|
LRE
#1 and MRE #1 Thermal and Voltage Analysis |
December
16, 1987 |
|
MRE
#1 Reflectivity |
December
16, 1987 |
|
PIF
and HRE Thermal Drift Preliminary Examination |
December
17, 1987 |
|
MRF
#1 gradient offset |
January
28, 1988 |
|
Thermal
drift of filter order #1 |
February
02, 1988 |
|
Addendum
to memo "LRE #1 and MRE #1 Thermal and Voltage Analysis" |
February
02, 1988 |
|
MRE
#1 Thermal Performance, I. Equilibrium Drift |
February
02, 1988 |
|
Statement
of work for second filter order |
February
16, 1988 |
|
White
Light Estimate of HRE #2 Reflectivity |
February
17, 1988 |
|
New Anode Gain Theory |
March
10, 1988 |
|
High
Pass Filter for HRDI |
September
23, 1988 |
|
Convolver
Routine |
November
10, 1988 |
|
HRDI
PF Filter Wheels |
December
07, 1988 |
| MRE
#2 Plates |
December
09, 1988 |
|
Manufacture
Date filter set #2 |
December
09, 1988 |
|
Photometer
Gain Change |
December
19, 1988 |
| Model
for IPD and HPC dark count. Version I |
December
20, 1988 |
| Convolver
Routine Update |
December
21, 1988 |
| Alternative
to Photometer pulse counting |
December
21, 1988 |
| HRE
#1 Flatness Maps from Perkin-Elmer |
December
30, 1988 |
| MRE
#1 Flatness Maps from Perkin-Elmer |
December
30, 1988 |
| LRE
#1 Flatness Maps from Perkin-Elmer |
December
30, 1988 |
| HRE
#2 Flatness Maps from Perkin-Elmer |
December
30, 1988 |
| Broadening
Valves for IPD-46 |
December
30, 1988 |
| MRE
#2 Flatness Maps from Perkin- Elmer |
December
30, 1988 |
| LRE
#2 Flatness Maps from Perkin- Elmer |
December
30, 1988 |
| Relative
HPC response |
January
04, 1989 |
| Telescope
transmittance Data |
January
11, 1989 |
| Light
Distribution of HRE Plane |
January
18, 1989 |
| Light
Distribution at Image plane |
January
18, 1989 |
| MRE
#1 Maps |
January
18, 1989 |
| LRE
#1 maps |
January
18, 1989 |
| HRE
#1 maps |
January
18, 1989 |
|
Dye
laser scan of 1-10-89 |
January
19, 1989 |
| IPD-48
Quantum efficiency |
January
23, 1989 |
|
Questar
Focal Length |
February
13, 1989 |
| Gain
changes for the HPC |
February
23, 1989 |
|
Dye
scans of March 6, 1989 |
March
07, 1989 |
|
Operation
of PIF with PSE Simulator |
April
03, 1989 |
|
IPD-49
quantum efficiency |
April
03, 1989 |
| Effects
of perfect anodes on effective peak of interferometer |
April
04, 1989 |
| Effects
of MRE finesse wind measurements |
April
04, 1989 |
|
Vibration
interferometer data |
April
10, 1989 |
|
IPD-49
blur spot sizes |
April
10, 1989 |
|
IPD
dark count -low temperature Problem |
May
05, 1989 |
| HRDI
flight filters calibration (continue Summary X) |
May
05, 1989 |
| Current
etalon finesses |
May
05, 1989 |
| Approximate
anode locations for default O2 Science lines |
May
10, 1989 |
| LRE
and MRE voltage and thermal terms |
May
10, 1989 |
| HRDI
reference line position |
May
10, 1989 |
| HRDI
default modes of operation |
May
11, 1989 |
| HPC
response as Function of orientation |
May
11, 1989 |
| Dye
Laser scans of 1-10-89 revised finesse calculations |
May
11, 1989 |
| Dye
laser scans of 1-3-89 revised finesse calculations |
May
11, 1989 |
| Dye
laser scans of 1-6-89 revised finesse calculations |
May
11, 1989 |
| HRDI
long term calibration |
May
15, 1989 |
|
|
|
Ball
memo-initial test results on 2 LTC and 12 fiber rods |
May
31, 1989 |
|
HRE
thermal Drift |
June
02, 1989 |
| Revised
etalon voltage coefficient |
June
05, 1989 |
| Calculated
P/T free spectral range |
June
12, 1989 |
| Etalon
gradient offsets |
June
20, 1989 |
| Dye
laser scans of February 16, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of March 5, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of March 9, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of March 20, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of March 23, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of April 5, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of April 12, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of April 14, 1989 finesse calculations |
June
27, 1989 |
| Dye
Laser scans of April 17, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of April 18. 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of May 3, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of May 8, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of May 17, 1989 finesse calculations |
June
27, 1989 |
| Dye
laser scans of May 31, 1989 finesse Calculations |
June
27, 1989 |
| Dye
laser scans of April 7, 1989 finesse calculations |
June
28, 1989 |
| HRDI
reference position |
June
29, 1989 |
|
IPD-49
and HPC dark counts |
June
30, 1989 |
|
HRDI/PIF
stability |
July
06, 1989 |
| Dye
laser scans of July 7, 1989 |
July
10, 1989 |
| Dye
laser scans of July 7, 1989 |
July
10, 1989 |
| HRDI/PIF
IPD-49 dead time |
July
12, 1989 |
| HRDI
Mechanism speeds |
July
19, 1989 |
| Dead
time correction |
July
20, 1989 |
| HPC
dead time |
July
24, 1989 |
|
HRDI
calibration flight filters (Continued Summary IX) |
|
| HPC
sensitivity |
July
24, 1989 |
|
Line
positions: Instrument warm in vacuum |
August
14, 1989 |
| Normalization
constants variation with IPD high voltage and discriminator
|
August
16, 1989 |
| Additional
Calibration lines |
August
16, 1989 |
| Repeatability
test specification |
August
28, 1989 |
|
IPD
sensitivity variation |
August
31, 1989 |
|
HRDI
internal white light lamp |
September
05, 1989 |
| Light
Distribution at LRF plane II. July 17, 1989 |
September
07, 1989 |
| Light
Distribution of image plane II. July 17, 1989 |
September
07, 1989 |
| Temporary
wavenumber assignment for plotting white light scans |
September
08, 1989 |
| Dye
laser scans of Sept. 14, 1989, finesse calculation |
September
14, 1989 |
| Repeatability
test #1 result |
September
14, 1989 |
| O2
lamp Spectra |
September
15, 1989 |
| Data
location of data taken September 20, 1989 |
September
20, 1989 |
| MRE
and LRE finesse |
September
20, 1989 |
| Data
location of data taken September 19, 1989 |
September
21, 1989 |
| White
light scans from September 20, 1989 |
September
21, 1989 |
| Conversion
of counts to R/cm¯¹
|
September
29, 1989 |
|
Activities
of September 30, 1989 |
| | |